Roadmap

We are 3 people running this whole company, pushing our limits to deliver for you. Our deadlines are optimistic (otherwise, we’d never have started!). Here’s our constantly updated roadmap: see what’s done, what’s in progress, and where the pain points are.

Sometimes we need to spend time on B2B customers or fundraising. Yes, it sets us back, but it’s the only way we can survive and ultimately ship the batteries you ordered.

If you’re an Indiegogo backer: we know we’re late, and you need your battery for the good weather. This idea keeps us awake at night-we just want to make sure we ship, that the product fits your needs, and that we can expand in the long term.

October 2024

Done

Indiegogo Campaign Finishes

We had 700 kits ordered with about 500 backers, half in the EU, half in the US.

Done

Tooling Ordered

Two weeks after the end of the campaign, we could release the funds and pay to manufacture the molds necessary to mass produce. The first phase consists of designing the molds and validating with corresponding prototypes.

Tooling Ordered

November 2024

Done

First Trip to China

Alex went to China for the first time to meet our partner. It was a great trip with a lot of discoveries about the culture and the level of technology and mastery in production.

First trip to China

Done

Production Prototype Validation

We received 3 samples that were CNC machined in the same way that the molds will produce the parts, so we could launch the final manufacturing.

Production prototype validation

December 2024

Done

Moving Offices

We could finally get rid of our big offices that cost too much money (since we decided to operate with a very limited team).

Done

Prototype Testing

We ran some first tests to check everything was as expected.

Prototype testing

Done

1st Survey

We sent a survey to inquire about the types of bikes and motors that the backers were needing.

Done

Production Tooling Complete

Molds are ready and we can start printing parts!

Production tooling complete
Done

First Batch of 180 Batteries

100 field test + 50 certifications + 30 samples. This first batch is mainly targeted at our French partner, Pony, on free-floating e-bikes, which will give us extra time to monitor the batteries' behavior in the harshest conditions (rain, snow, shocks, intense daily usage) and ensure everything is working perfectly before we produce the largest batches for end-users!

First batch of 180 batteries

January 2025

Done

2nd Trip to China: To Inspect First Batch

All is great except a little surprise on the electronic production line.

2nd trip to China

Done

Reverse Engineer Bosch Protocol

We are able to start the motor and mimic a Bosch battery (this was so hard to do) but it gives us the proof that we can do all major protocols as Bosch is known to be the hardest.

Done

X-ray Inspection

We brought the electronic board to the lab to inspect the production deeply. All good but some minor details will be tuned for mass production.

X-ray inspection

February 2025

Done

Harsh Tests on the Batteries

Our batteries have undergone rigorous testing with impressive results. They withstand vibrations up to 200Hz, feature excellent waterproofing with a protective casing and pressure valve, and include advanced safety features that provide 10+ minutes of flame resistance. The BMS has proven its durability by passing corrosion tests in salty water while maintaining consistent and reliable power consumption performance.

Harsh tests on the batteries

Done

2nd Survey

Aimed to gather addresses from backers to find the best logistic solutions.

Done

Split Logistics for Cells

We realized we cannot ship cells together with the kit, trying to find some partners on each of our markets.

Done

3400 Units Ordered from Pony

This is a major milestone as it is a big deal which is vital to finance the company but also a big challenge as they need the batteries in May.

Done

Assembly Partner in France

In order to assemble the 3400 kits for Pony, we trained Arts Energy based in Angoulême to assemble our kits. Their role is to source the cells, receive the kits from China, make the assembly, run the end of line tests and ship to Pony.

Assembly partner in France
Done

Major Code Rewrite

We decided to rewrite all the battery codebase in Rust. The former C++ version was becoming too complex and unstable. One example: we spent 3 days catching a bug that would make the battery code crash randomly (but like once every 2h of rides): the culprit: some weird wifi broadcasting badly encrypted SSID.

March 2025

Done

Component Sourcing

Took 3 weeks to validate the sourcing of the 150+ references needed to manufacture each battery. We placed an order for 4400 kits (3400 for Pony, 1000 for backers and next orders).

Component sourcing
Done

BMS Test Bench

We designed, produced and tested a flashing bench enabling us to test the BMS (based on Raspberry Pi, each can provision 1 BMS per minute).

BMS test bench
Done

Tooling for Support

We had to redesign this part and launch it in production.

Tooling for support
Done

100 Batteries Running

The 100 units of test for Pony are in the streets used in the harshest conditions ever (charged every 3 days).

100 batteries running
Done

Trip to the US

The goal here is to meet a bike refurbishing company that could be a good investor. We had a very good meeting and will work together.

Trip to the US
Done

Trip to Taiwan

We were invited for the Taipei show where we had the best prize for sustainability and innovation (or was it the year before?).

Trip to Taiwan

Done

Certification Launched

Just for UN38.3 with SGS (preparing the samples) as we need more finance to launch the others (EN50604 and UL).

Done

Selection of Chargers

Found and tested charger references.

April 2025

Done

Logistic Issues

With cargo customs for the first 6 palettes of batteries to ship to Pony, took 10 more days.

Logistic issues
Done

Manufacturing Defect

After unboxing 1500 BMS, we cannot flash them! Huge stress moment for a couple of days until we discover one resistor has the wrong value (1 mOhm instead of 1 Mohm).

Manufacturing defect
Done

Manual Rework

In order to start the mass production with Arts Energy, we rework the BMS by hand.

Done

48V Version

We ordered the PCB of both contact and BMS for the 13s version and made them by hand to make sure everything was well routed.

48V version
Done

E-commerce Website

We started designing and setting the E-commerce website which looks simple but requires lots of work. We had to create 3D rendering of all parts and of the battery in context, set up the countries, fine-tune many parameters…

Done

Shipping in Bundles

The fact that many people want specific orders, we realize how we need to sell: instead of having a box with a static kit we should let customers choose the parts with the variation they need and with some other accessories (example: a kit with red handle, in 36V version, with 2 chargers and 3 supports).

Done

SKU and EAN Numbers

We had to create a logic and compliant nomenclature of parts so that they can be scanned in the logistic warehouses and bundles can be created.

SKU and EAN numbers
Done

Packaging Definition

Each part must be packaged separately and we need to define the outer carton to explain our logistic partners how we feed them.

Packaging definition
Done

Bundle in Shopify

We managed to set up the Shopify website so people can buy both spare parts and bundles in a clear way (you’ll tell us).

Done

Rust Firmware on Alex Bike

Basic batteries functionalities working and over the air updates are also working well thanks to Max.

Done

iPhone/Android App

Mael refactored the app so that it can help customers diagnose their battery and set up their controller.

iPhone/Android app

May 2025

Done

New Patent

On our fireproof casing technology.

In Progress

UN38.3 is Done

We finally got all the document for the UN38.3 certification.

Done

3DP / Amazon

After many refusals from 3DP companies that don’t want to work with small companies to pick and pack, we will decide on May 16 whether we work with Amazon or a 3DP company to do the picking and packing, shipping. Considerations are: do we need a warehouse on both continents, how to deal with returns, price.

Done

Mass Production

Arts Energy is assembling 120 batteries per day with two people working 7 hours. So it's about 5 minutes per battery including supplies, end of line tests etc and without any automation. They have produced 3500 units so far.

Mass production
Done

Finished Reworking and Flashing all the Faulty BMS for Pony

Rework BMS for Pony
Done

Bug Correction

Correcting some bugs that are edge cases but that start to be present with the growing number of batteries in service.

Bug correction
Done

Cell Distribution in Europe

We managed to deal with one cell distributor for EU that will be shipping the cells to our customers. Two references already tested on the Infinite are proposed.

Done

Backers Kits Production Status

36V kits are done and packaged ready to ship. 48V kits should be shipped to our warehouse by the end of the month.

Bug correction
Done

Importing Backer Order in Shopify

This way we can have a clear tracking and we can charge the right amount of delivery and tax costs.

Done

Reopen US Market

Since tariffs went down to 30% for 90 days.

Done

Bare Minimum Rust Version of the Software Ready

Including UVLO (security that cuts all BMS consumption when reaching a certain voltage), BLE communication implementation.

Done

Finalize the App Development

Including the choice of the cell and protocol.

My gouach
Done

Investment

Closing a round with our US investors, legal stuff to deal with but very good news.

June 2025

Done

Deal with One Cell Distributor for US

Done

Shipping to all our backers and customers

Finally ! After 10 days in struggle with customs in France, one week lost because the bar codes where not encoded using the correct encoding, we are finally there.

Fullfilment
Done

People start unboxing and assembling

We were surprised on how many people just had no issue and assembled their battery without even telling us (which is normal).

First assemblies
Done

Worked on documentation while answering all the questions by email

We also want to create a formu so all the community can benefit from questions answered by email.

Documentation

July 2025

Todo

Implementing Bosch Protocol in the New Rust Code Base

First success

Bosch demo
In progess

Bosch adaptators design

Designing the adaptator so the retrofit for Bosch deosn't require to cut cables.

Bosch demo
Todo

Launching Ads on Mailing for B2B Customers

In order to create volume and see what brands could integrate the first repairable battery.

Todo

Data Storage in Rust

Implemented and tested.

Todo

Specify a bigger battery for a 800Wh or more in capacity and up to 52V

Todo

Specifying Our New Battery Model for Another Vertical

That we will disclose in October.

Todo

Certifications

After 2 months of discussions, we should launch UL2170 and EN50604 certification with UL labs.

August 2025

Todo

User Alerts by Mail

We have this feature for our B2B customer but we want to push it for B2C.

Todo

Advertise on Social Media

Once we’ve sent the kits to all our backers, we should start serving new customers.

Todo

Back and Forth with Supplier

To make a first prototype of the new battery.

Todo

Rest a Bit

September 2025

Todo

Implementing Data Storage on the Rust Version

So that the battery has a history.

Todo

Implementing Next Protocols

Rad, Bafang, Specialized, Brose.

Todo

Reverse Engineering Shimano

Which is the second most demanded brand that has an encrypted communication.

Todo

Designing the Bosch Adapter and Sending in Production

Todo

Designing the Shimano STePS Adapter and Sending in Production

Todo

Designing a Bigger Version of the Battery

Make a poll to see whether it would fit the needs of the community.

Todo

Designing a USB-C Addon

A module that would enable to use your battery as a powerbank and also charge through USB-C.

Todo

Implementing Geolocalisation on Batteries

To fight battery theft.

Todo

New Model Announcements and Demo